You don't have javascript enabled. Good luck with that.
Pencarian
 Tim Gabungan Tinjau Turap Longsor di Kali Cipinang

Collapsed Retaining Wall of Cipinang River in Cibubur Repaired

The collapsed retaining wall of Cipinang River in Cibubur Urban Village, Ciracas District, East Jakarta will be repaired.

The repair must be run soon

As the early stage, the ranks of Ciracas District together with Cimanggis District, Depok, West Java, inspected the area today.

Ciracas District Secretary, Abdul Khair said the collapsed retaining wall length reached more than 73 meters.

Gubug Genteng Phb Channel Retaining Wall Repair Reaches 75 Percent

"Cipinang River is under the jurisdiction of the central government, or BBWSCC. We'll submit proposal for this repair," he said, Tuesday (8/5).

He hopes the repair can be started soon since the location is near with the residential of RW 14, Cibubur Urban Village.

"The repair must be run soon to avoid overflow water inundate the residential during heavy rain," he added.

Meanwhile, Ciracas District's Water Resource Taskforce Coordinator, Deby stated the repair will be run by Jakarta Water Resource Agency.

"We remain in coordination stage to realize the repair," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye868 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye354 personAldi Geri Lumban Tobing
close