You don't have javascript enabled. Good luck with that.
Pencarian
 Tim Gabungan Tinjau Turap Longsor di Kali Cipinang

Collapsed Retaining Wall of Cipinang River in Cibubur Repaired

The collapsed retaining wall of Cipinang River in Cibubur Urban Village, Ciracas District, East Jakarta will be repaired.

The repair must be run soon

As the early stage, the ranks of Ciracas District together with Cimanggis District, Depok, West Java, inspected the area today.

Ciracas District Secretary, Abdul Khair said the collapsed retaining wall length reached more than 73 meters.

Gubug Genteng Phb Channel Retaining Wall Repair Reaches 75 Percent

"Cipinang River is under the jurisdiction of the central government, or BBWSCC. We'll submit proposal for this repair," he said, Tuesday (8/5).

He hopes the repair can be started soon since the location is near with the residential of RW 14, Cibubur Urban Village.

"The repair must be run soon to avoid overflow water inundate the residential during heavy rain," he added.

Meanwhile, Ciracas District's Water Resource Taskforce Coordinator, Deby stated the repair will be run by Jakarta Water Resource Agency.

"We remain in coordination stage to realize the repair," he stated.

Linked News
Popular News indeks
  1. Pramono Pushes to Complete Long-Delayed Pluit JLNT by March 2027

    access_time20-11-2026 remove_red_eye697 personDessy Suciati
  2. JAF 2026 Highlights Maritime Heritage and Coastal Architecture

    access_time21-11-2026 remove_red_eye683 personAnita Karyati
  3. Hosted in Sydney, Pramono Discusses Opening Australian Campuses in Jakarta

    access_time25-11-2026 remove_red_eye667 personDessy Suciati
  4. Jakarta Strengthens ASEAN Cooperation on Climate, Transport, and Youth

    access_time20-11-2026 remove_red_eye638 personFolmer
  5. BORJU Markets 200 Local Products

    access_time20-11-2026 remove_red_eye607 personAnita Karyati